Case studies
Real Glasgow kitchen projects, real numbers.
Six detailed case studies from kitchens we've designed, supplied and installed across Greater Glasgow. Each one covers scope, cost band, time on site, challenges and outcome — so you can judge our work against your own project.
Privacy: Exact street and client details withheld for privacy. Postcode district and project facts are accurate.
- Painted shaker/West End, Glasgow
Shaker kitchen in a West End sandstone tenement (G12)
Painted shaker units, quartz worktop and a new run of lower cabinets in a first-floor sandstone tenement. £18k–£22k, 3.5 weeks on site.
£18,000 – £22,0003.5 weeks on siteG12 (district level)Single galley run with peninsular breakfast bar - True handleless/Bearsden, East Dunbartonshire
Handleless kitchen in a Bearsden extension (G61)
Matt-graphite handleless units, 4.2m quartz island and integrated Siemens appliances in a 1960s detached. £34k–£40k, 5 weeks on site.
£34,000 – £40,0005 weeks on siteG61 (district level)Two-wall + 4.2m island - Painted slab with timber accent island/Newton Mearns, East Renfrewshire
Full kitchen renovation with island in Newton Mearns (G77)
Removed the dining wall, added a steel, fitted a 3.6m island with seating for four. £42k–£48k, 6.5 weeks on site.
£42,000 – £48,0006.5 weeks on site (including structural works)G77 (district level)L-shaped wall run plus 3.6m × 1m island with seating for four - Light-grey shaker with brushed nickel handles/Shawlands, Southside Glasgow
Small galley kitchen in a Shawlands tenement (G41)
2.6m × 2.2m galley refit with a tall larder, integrated appliances and laminate worktop. £11k–£14k, 2.5 weeks on site.
£11,000 – £14,0002.5 weeks on siteG41 (district level)Galley - Cream in-frame shaker with brass cup handles/Giffnock, East Renfrewshire
Traditional kitchen with utility room in Giffnock (G46)
Cream in-frame shaker, brass ironmongery and a matching utility off the back hall. £26k–£32k, 4.5 weeks on site.
£26,000 – £32,0004.5 weeks on siteG46 (district level)L-shape kitchen plus separate 2.4m × 1.6m utility - Two-tone painted shaker — navy base/East Kilbride, South Lanarkshire
Open-plan kitchen-diner in East Kilbride (G75)
Two-tone navy-and-oak shaker, peninsular with seating for three. £24k–£28k, 4 weeks on site.
£24,000 – £28,0004 weeks on siteG75 (district level)L-shape with 2.4m peninsular and seating for three